To retain the historical character of Amsterdam's city centre
-
Innovative construction methods
-
The world's largest monitoring program
The North-South Metro Line Amsterdam
Widely regarded as one of the most challenging infrastructure projects in Dutch history, the North-South Metro Line in Amsterdam. Witteveen+Bos, Royal HaskoningDHV and Ingenieursbureau Amsterdam collaborated on the project in a consortium called Adviesbureau Noord/Zuidlijn.
During the design phase, the contract preparations and the supervision of the performance of work, the joint venture made a significant contribution to this technically complex project. A key precondition in the design phase was the requirement to retain the historical character of Amsterdam’s city centre. At the start of the project in 1994, this meant that the underground metro line could only be realised if conventional construction methods were applied in a very creative manner. Existing methods such as bored and immersed tunnel construction and pneumatic sinking of caissons have undergone radical innovation to suit the unique circumstances prevailing in Amsterdam. By developing these innovative methods, the Dutch engineering and construction industry has now gained an even stronger leading position in underground construction, both domestically and internationally.